What 1:2:4 Actually Means
A mix ratio counts buckets, not kilograms, and 1 m³ of concrete needs 1.54 m³ of dry material. The exact…
Counts the bars in a reinforcement mat from the slab size, spacing and cover, with laps, achieved spacing and total steel weight.
The Rebar Spacing Calculator counts the bars in a reinforcement mat from the slab size, spacing and cover, with laps, achieved spacing and total steel weight. It runs as plain JavaScript inside the page, which means there is no upload step, no queue and no size limit imposed by a server — the only limit is your own device.
| A maximum spacing | ceil(clear ÷ spacing) + 1 |
|---|---|
| The classic error | Short by one bar per direction |
| Cover | Comes off BOTH ends |
| Weight rule | d² ÷ 162 kg per metre |
A quantity take-off for a rectangular mat. It does not design reinforcement, check adequacy, handle openings, edge bars, chairs or bent shapes, and it is not a substitute for a bar bending schedule.
A mix ratio counts buckets, not kilograms, and 1 m³ of concrete needs 1.54 m³ of dry material. The exact…
Works out the monthly payment, total interest and full repayment schedule for any loan from…
Calculates your Equated Monthly Instalment with a full principal-versus-interest breakdown and…
Estimates a full monthly housing payment including principal, interest, property tax…
Calculates a car finance payment from the price, deposit, trade-in, interest rate and term…
Works out instalments and total cost for an unsecured personal loan, including any processing…
Produces a complete month-by-month table showing how each payment splits between interest and…
Shows how savings grow with compound interest, including regular contributions and any…
Calculates simple interest and the final amount from principal, rate and time, without…
Projects the maturity value of a monthly Systematic Investment Plan, showing invested amount…
Calculates what a one-off investment grows to at a given annual return over any number of years.